Contact Us
Strategic Plan |
|
Municipality of West Perth's Strategic Plan Strategic plans play a vital role in the life of a municipality. They set a vision for the community, define the community's goals and aspirations and help to evolve the corporation to continue to deliver services well. |
West Perth Recreation and Leisure Master Plan |
| On January 13, 2025 the West Perth Council adopted the Recreation and Leisure Master Plan.
The primary goal of this study was to research, develop, design, and produce a community supported Master Plan document for recreation, leisure, and culture services and facilities. This was achieved through four phases. Updates on the progress made towards the 56 recommendations are outlined in the following reports to council: 2019 Recreation & Leisure Plan Report |
| Recreation, Parks and Trails Master Plan |
About the ProjectAbout the Project The Municipality of West Perth is prepared a Recreation, Parks and Trails Master Plan to ensure that our system of recreation spaces, parks, outdoor spaces, and trails continues to meet resident needs into the future. The Plan will consider community input, demographic shifts, emerging activities, asset condition, and more to set priorities for improving these critical public spaces and identifying needs to the year 2034. Specifically, the Plan will address:
Parks, recreation services, and trails contribute to individual and community health and wellbeing in many ways. They encourage active lifestyles and active transportation, support leisure activities and special events, preserve natural heritage and wildlife habitat, strengthen tourism and economic development, and contribute to healthy communities. |
| West Perth Administration Campus Feasibility Study |
|
In January 2018 the Municipality of West Perth commenced an Administration Campus Feasibility Study with the assistance of Wilson Diaz Architects Inc. The West Perth Council passed a resolution at the May 4, 2018 Council Meeting to proceed with a preliminary public consultation for the Municipal Campus on June 19, 2018. Wilson Diaz Architects presented rendered drawings of the possible Municipal Campus, Site Plan drawings and presentation slides. You can view .pdf versions of these documents by following the links above |
| Creating A Healthy Environment |
| Greenhouse Gas Reduction Plan |
| West Perth Energy Conservation and Demand Management Plan |
| West Perth Energy Conservation and Demand Management Plan |
| Community Safety and Well-being Plan |
| Community Safety and Well-being Plan - Implementation Plan: 2021-2024 |
| Building Condition Assessments (BCA) |
|
Mitchell Arena - Visual Structural Mitchell Arena - Infared Therographic Roof Inspection Mitchell Arena - Roof Asset Management Program Brodhagen Community Centre - 6708 Perth Line 44 Cromarty Pavilion - 6984 Line 21, Staffa Distribution #4 - 50 Arthur Street, Mitchell Distribution #123 - 132 St. George Street, Mitchell Dublin Hall - 7015 Helen Street - 7015 Helen Street Dublin Pavilion - 7015 Helen Street Dublin Washroom Building - 7015 Helen Street Fullarton Centennial Park Booth - 2999 Perth Road 163A Fullarton Centennial Park Pavilion - 2999 Perth Road 163A Herbert Pumping Station - 79 Herbert Street, Mitchell James Street Pumping Station - 123 James Steet, Mitchell Kinsmen Park Pavilion - 5973 Frank Street, Mitchell Landfill Scale House - 125 Clarke Street, Mitchell Landfill Storage Building - 125 Clarke Street, Mitchell Lions Accessible Pavilion - 17 Blenheim Street, Mitchell Lions Park Animal Barn - 17 Belnheim Street, Mitchell Lions Park Storage Building - 17 Belnheim Street, Mitchell Lions Pavilion - 17 Blenheim Street, Mitchell Morenz Gazebo - 8 Huron Road, Mitchell North Logan Cemetery - 6742 Line 53, Monkton Operations Shops - 50 Arthur St Steet, Mitchell OPP - 132 St. George Street, Mitchell Optimist (Splash Pad) Pavilion - 19 Blenheim Street, Mitchell Sofina Pavilion - 17 Blenheim Street, Mitchell Staffa - Cemetery Building - 3156 Perth Road 180 Well # 1 - 132 St. George Street, Mitchell Well #2 - 132 St. George Street, Mitchell Well #3 - 90 St. George Street, Mitchell West Perth Fire Hall - 170 Wellington Street, Mitchell West Perth Library - 105 St Andrew Street, Mitchell West Perth Lions Pool - 17 Blenheim Street, Mitchell WWTP Blower Building - 5949 Frank Street, Mitchell |
| Heron Industrial Park |
|
The Municipality of West Perth initiated a Class Environmental Assessment in September 2017 to evaluate potential solutions to address servicing deficiencies associated with lands designated for industrial development in the southern area of Mitchell. The study process followed the procedures set out in the Municipal Class Environmental Assessment document, dated October 2000, as amended in 2007, 2011, 2015 and 2024. B.M. Ross and Associates Limited was engaged to conduct the Class EA investigation on behalf of West Perth. The purpose of this report is to document the Class EA planning and design process followed for this project. This report includes the following major components:
Class Environmental Assessment For Development of the Heron Industrial Park Class Environmental Assessment For Development of the Heron Industrial Park Appendicies Mitchell Advocate - Notice of Study Completion
|
| Community Improvement Plan (CIP) |
|
What is a CIP? What is the purpose of this project?
Please click the link below to view the updated Community Improvement Plan. Community Improvement Plan PDF
Please click the button above to review our draft Community Improvement Plan, below is the CIP areas.
|